Items where Department is "Architectural Engineering and Construction Management" and Year is 2024

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 10.

Thesis

A FRAMEWORK FOR IMPLEMENTING MODULAR HOUSING PROJECTS IN SAUDI ARABIA. Masters thesis, King Fahd University of Petroleum and Minerals.

Designer Knowledge’s Effect On Construction Project’s Performance In Saudi Arabia. Masters thesis, King Fahd University of Petroleum and Minerals.

BIM-based Accident Investigation: Central Repository and Visualization for Accident/Incident Data. Masters thesis, King Fahd University of Petroleum and Minerals.

BLOCKCHAIN TECHNOLOGY APPLICATIONS AND CHALLENGES IN THE SAUDI ARABIAN CONSTRUCTION INDUSTRY. Masters thesis, King Fahd University of Petroleum and Minerals.

Fuzzy-Based Model for Assessing the Digitalization Level of Construction Projects in Saudi Arabia. Masters thesis, King Fahd University of Petroleum and Minerals.

THE THERMAL ASSESSMENT OF ENERGY ACTIVE WINDOW SYSTEM IN BUILDINGS IN HOT CLIMATES. Masters thesis, King Fahd University of Petroleum and Minerals.

RISK AND EXPERIENCE BASED STOCHASTIC MODEL FOR FORECASTING THE FINAL COST OF A PROJECT. Masters thesis, King Fahd University of Petroleum and Minerals.

COMPRESSION OF PROJECT SCHEDULES USING ETRPOY- TOPSIS AND THE BEST-WORST-METHOD. Masters thesis, King Fahd University of Petroleum and Minerals.

DEVELOPING A RISK ASSESSMENT MODEL FOR PREFABRICATED BRIDGE CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES. Masters thesis, King Fahd University of Petroleum and Minerals.

ENHANCING THE CONSTRUCTION RESILIENCE TO COPE WITH THE POST COVID-19 PRECAUTIONS MEASURES UNCERTAINTY: A FUZZY-BASED APPROACH. Masters thesis, King Fahd University of Petroleum and Minerals.

This list was generated on Thu Nov 21 14:36:42 2024 +03.