Items where Author is "Duffuaa, S. O."

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 30.

One-Machine Scheduling To Minimize Mean Tardiness With Minimum Number Tardy. PRODUCTION PLANNING CONTROL;, 8. pp. 226-230.

Impact Of Inspection Errors On The Performance Measures Of A General: Repeat Inspection Plan. INTERNATIONAL JOURNAL OF PRODUCTION, 43. pp. 4945-4967.

SCALE REMOVAL FROM HEAT-EXCHANGERS - USING ENERGY-UTILIZATION AS A SCHEDULE CRITERION. APPLIED ENERGY, 47. pp. 77-85.

Critical Evaluation Of Simulation Studies In Maintenance Systems. PRODUCTION PLANNING CONTROL, 13. pp. 336-341.

General Inspection Plan For Critical Multicharacteristic Components. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 35. pp. 2723-2736.

A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units. Electric Power Systems Research, 54. pp. 91-99.

EVALUATION OF OPTIMIZATION METHODS FOR MACHINING ECONOMICS MODELS. COMPUTERS OPERATIONS RESEARCH, 20. pp. 227-237.

Process Targeting With Multi-Class Screening And Measurement Error. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41. pp. 1373-1391.

A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 32. pp. 1897-1907.

An Optimal Repeat Inspection Plan With Several Classifications. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 53. pp. 1016-1026.

Impact Of Scale Build-Up Models On Energy Utilization In Heat Exchangers. INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 23. pp. 999-1005.

Integrated Process Targeting And Product Uniformity Model For Three-Class Screening. SEVENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN. pp. 58-62.

Minimizing Mean Tardiness Subject To Unspecified Minimum Number Tardy For A Single Machine. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 89. pp. 100-107.

ON IMPROVING HUMAN RELIABILITY IN COMPUTER-PROGRAMMING. KYBERNETES, 22. pp. 9-15.

Process Targeting Of Multi-Characteristic Product Using Fuzzy Logic And Genetic Algorithm With An Interval Based Taguchi Cost Function. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT. pp. 1204-1208.

Reliability Centered Maintenance Concepts And Applications: A Case Study. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING : THEORY APPLICATIONS AND PRACTICE, 7. pp. 123-132.

Repeat Inspection Planning Using Dynamic Programming. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 44. pp. 257-270.

A Stochastic Programming Model For Scheduling Maintenance Personnel. APPLIED MATHEMATICAL MODELLING, 23. pp. 385-397.

A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units. ELECTRIC POWER SYSTEMS RESEARCH, 54. pp. 91-99.

Stochastic Simulation Model For Maintenance Manpower Planning. SEVENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN. pp. 230-236.

The Use Of Shuttle Buses In Hajj To Transport Pilgrims: A Simulation Study. SEVENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN. pp. 225-229.

Integrating Statistical Process Control, Engineering Process Control And Taguchi'S Quality Engineering. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 42. pp. 4109-4118.

A MATHEMATICAL OPTIMIZATION MODEL FOR CHEMICAL PRODUCTION AT SAUDI-ARABIA FERTILIZER COMPANY. APPLIED MATHEMATICAL MODELLING, 15. pp. 652-656.

A LINEAR-PROGRAMMING APPROACH FOR THE WEIGHTED GRAPH MATCHING PROBLEM. IEEE TRANSACTIONS ON PATTERN ANALYSIS AND MACHINE INTELLIGENCE, 15. pp. 522-525.

A SIMULATION-MODEL FOR DETERMINING MAINTENANCE STAFFING IN AN INDUSTRIAL-ENVIRONMENT. SIMULATION, 59. pp. 93-99.

An Extreme Point Algorithm For A Local Minimum Solution To The Quadratic Assignment Problem. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 156. pp. 566-578.

A LINEAR-PROGRAMMING MODEL TO EVALUATE GAS AVAILABILITY FOR VITAL INDUSTRIES IN SAUDI-ARABIA. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 43. pp. 1035-1045.

OPTIMAL SHUNT COMPENSATORS AT NON-SINUSOIDAL BUSBARS. IEEE Transactions on Power Systems, 10. pp. 716-723.

One-Machine Scheduling To Minimize Mean Tardiness With Minimum Number Tardy. PRODUCTION PLANNING CONTROL, 8. pp. 226-230.

AN INTEGRATED SIMULATION MODEL FOR MANNING MAINTENANCE SHOPS. NCC1997.

This list was generated on Sat Nov 23 13:06:29 2024 +03.