Evaluation of the construction equipment replacement policies of construction contractors in the Eastern Province of Saudi Arabia

(2001) Evaluation of the construction equipment replacement policies of construction contractors in the Eastern Province of Saudi Arabia. Masters thesis, King Fahd University of Petroleum and Minerals.

[img]
Preview
PDF
9915.pdf

Download (6MB) | Preview

Arabic Abstract

الغرض من هذا البحث هو دراسة طرق إحلال المعدات الإنشائية التي يتبعها كبار المقاولين بالمنطقة الشرقية من المملكة العربية السعودية وذلك للوصل إلى أمثل الطرق المتبعة في هذا المجال . المعلومات اللازمة لهذه الدراسة جمعت بواسطة مسح ميداني عن طريق استبيان وزع على سبعين (70) مقاولاً واستجاب للاستبيان واحد وعشرون (21) مقاولاً . وتم توزيع هؤلاء المقاولين إلى ثلاث مجموعات بناءً على أحجام أعمالهم التجارية السنوية ، كما تم تحليل هذه المعلومات باستخدام برنامج “SAS” الإحصائي . وقد تم ربط مقومات وعوامل إحلال المعدات مع البيانات والجداول التي استخلصت من البرنامج الإحصائي “SAS” وذلك لمعرفة الفروقات بين الطرق المتبعة من قبل المقاولين . كما تم تحديد طرق إحلال المعدات والعوامل التي يتم دراستها خلال عملية تقييم عروض إحلال المعدات الإنشائية . كذلك تم مقارنة نتيجة الاستبيان مع بعض الاستبيانات التي سبق أن أجريت في الولايات المتحدة الأمريكية للتعرف على أوجه الشبه والاختلاف بين الطرق المتبعة في كلتي الدولتين والاستفادة من تجارب المقاولين الأمريكية في هذا المجال . وبالرغم من أن ثلث المقاولين فقط لديهم طرق موثقة لتغيير المعدات ، فإن كل المقاولين يمارسون طرق مماثلة وموحدة في مجالات الاختيار ، الطلب ، التشغيل والصيانة ، حفظ التقارير ، وتحليل عروض التغيير . ولقد لوحظ أن المقاولين في المملكة العربية السعودية غالباً ما يتبعون طرقاً مماثلة لتلك المتبعة في الولايات المتحدة الأمريكية .

English Abstract

The objective of this thesis is to study the equipment replacement methods and practices of major contractors in the Eastern Province of Saudi Arabia, to present the most popular practice of the contractors. The needed data were collected via a structured questionnaire from 21 contractors out of 70 contractors in the population. The contractors were divided into three grades based on their annual work volumes. The collected data were analyzed using the SAS software which produces statistics, frequency, and cross tabulation charts. The elements of the equipment replacement policies were corss-tabulated against the grades of the contractors for finding possible significant differences in the contractor's practices. The equipment replacement methods along with the factors that are considered during the financial evaluation of the equipment replacement proposals were identified and studied in order to find the best replacement practice. Finally, the findings of this study were compared with findings of similar studies conducted in USA for finding significant commonalities and differences in equipment replacement practices. Although only one-third of the contractors have written equipment replacement policy, all the contractors practice almost similar and uniform procedures for selecting, acquiring, operation and maintenance, record keeping, and replacement analysis. It was interesting to notice that contractors in Saudi Arabia follow replacement procedures that are almost similar to those procedures followed by contractors in USA.

Item Type: Thesis (Masters)
Subjects: Architectural
Department: College of Design and Built Environment > Architectural Engineering and Construction Management
Committee Advisor: Shash, Ali Ali
Committee Members: Assaf, Sadi A. and Andijani, Abdulbasit A. and Al-Khalil, Mohammed
Depositing User: Mr. Admin Admin
Date Deposited: 22 Jun 2008 13:52
Last Modified: 01 Nov 2019 13:52
URI: http://eprints.kfupm.edu.sa/id/eprint/9915