A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units

A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units. Electric Power Systems Research, 54. pp. 91-99.

[img] Microsoft Word (A research paper on : A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units)
a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc

Download (29kB)

Abstract

A new heuristic algorithm based on the Tabu search has been proposed for the maintenance schedule (MS) of electric generation units. The algorithm was developed, implemented and tested on an integrated model for the MS problem. The model. used two criteria: minimizing the total generator operating cost and levering the reserve. Each of the above criteria is used with the following constraints: maintenance completion, crew size, precedence, reserve and reserve constants. The performance of the Tabu search algorithm is promising. The Tabu search algorithm solved two power system problems, 4 units and 22 units. The implicit enumeration algorithm was used to check the validity and the quality of the Tabu search solution. (C) 2000 Published by Elsevier Science S.A. All rights reserved.

Item Type: Article
Subjects: Systems
Department: College of Computing and Mathematics > lndustrial and Systems Engineering
Depositing User: SYED AMEENUDDIN HUSSAIN
Date Deposited: 11 Jun 2008 07:40
Last Modified: 01 Nov 2019 13:30
URI: http://eprints.kfupm.edu.sa/id/eprint/1979