Items where Author is "Bendaya, M."
Group by: Item Type | No Grouping Jump to: Article Number of items: 22.
ArticleBendaya, M. and HARIGA, M COMPARATIVE-STUDY OF HEURISTICS FOR THE JOINT REPLENISHMENT PROBLEM. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 23. pp. 341-344. Darwish, M. and Bendaya, M. Effect Of Inspection Errors And Preventive Maintenance On A Two-Stage Production Inventory System. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 107. pp. 301-313. Darwish, M. and Bendaya, M. Effect Of Inspection Errors And Preventive Maintenance On A Two-Stage Production Inventory System. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 107. pp. 301-313. Bendaya, M. and Rahim, MA Effect Of Maintenance On The Economic Design Of (X)Over- Bar-Control Chart. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 120. pp. 131-143. Bendaya, M. and AlFawzan, M An Efficient Tabu Search Algorithm For The Single-Machine Mean Tardiness Problem. PRODUCTION PLANNING CONTROL, 8. pp. 694-700. Darwish, M. and Bendaya, M. Imperfect Production Systems With Imperfect Preventive Maintenance, Inflation, And Time Value Of Money. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 23. pp. 89-105. Bendaya, M. and Noman, SM Integrated Inventory And Inspection Policies For Stochastic Demand. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 158. pp. 159-169. Bendaya, M. and Noman, SM and Hariga, M Integrated Inventory Control And Inspection Policies With Deterministic Demand. COMPUTERS OPERATIONS RESEARCH, 33. pp. 1625-1638. Bendaya, M. and Makhdoum, M Integrated Production And Quality Model Under Various Preventive Maintenance Policies. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 49. pp. 840-853. Bendaya, M. Integrated Production Maintenance And Quality Model For Imperfect Processes. IIE TRANSACTIONS, 31. pp. 491-501. Bendaya, M. and Hariga, M Integrated Single Vendor Single Buyer Model With Stochastic Demand And Variable Lead Time. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 92. pp. 75-80. Darwish, M. and Bendaya, M. and Ertogral, K. The Joint Economic Lot Sizing Problem: Review And Extensions. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 185. pp. 726-742. Bendaya, M. LINE SEARCH TECHNIQUES FOR THE LOGARITHMIC BARRIER FUNCTION IN QUADRATIC-PROGRAMMING. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 46. pp. 332-338. Bendaya, M. and Hariga, M Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41. pp. 571-579. Bendaya, M. and AlSultan, KS A New Penalty Function Algorithm For Convex Quadratic Programming. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 101. pp. 155-163. Bendaya, M. and RAOUF, A ON LEAD TIME MANAGEMENT IN INVENTORY MODELS. IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 13. pp. 125-132. Duffuaa, S. O. and Raouf, A. and Bendaya, M. and Makki, M. One-Machine Scheduling To Minimize Mean Tardiness With Minimum Number Tardy. PRODUCTION PLANNING CONTROL, 8. pp. 226-230. Duffuaa, S. O. and Raouf, A. and Bendaya, M. and Makki, M One-Machine Scheduling To Minimize Mean Tardiness With Minimum Number Tardy. PRODUCTION PLANNING CONTROL;, 8. pp. 226-230. Bendaya, M. and Rahim, A Optimal Lot-Sizing, Quality Improvement And Inspection Errors For Multistage Production Systems. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41. pp. 65-79. Darwish, M. and Ertogral, K. and Bendaya, M. Production And Shipment Lot Sizing In A Vendor-Buyer Supply Chain With Transportation Cost. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 176. pp. 1592-1606. Ertogral, K. and Darwish, M. and Bendaya, M. Production And Shipment Lot Sizing In A Vendor-Buyer Supply Chain With Transportation Cost. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 176. pp. 1592-1606. Duffuaa, S. O. and Bendaya, M. and Al-Sultan, K.S. and Andijani, A. A. Stochastic Simulation Model For Maintenance Manpower Planning. SEVENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN. pp. 230-236. |